Bob Gisburne's S90 Express is for sale.
To whom it may concern:
Engine was a first run core, rebuilt by DeMars Aero in Fort Collins CO.
It is a 260hp model that I put Millenium cylinders on and high
compression pistons, so it puts out 290hp. Very smooth running and
strong engine. Total time since reman 310 hours.
Prop was a rebuild yellow tag unit from American Propellors in Northern,
CA. 3-blade McCauley, also 310 TT since reman. Also, new prop governor.
Avionics were all NEW except for the King HSI system which was a yellow
tag reman unti from JA Avionics in DuPage, IL. They built the entire
panel and it is indeed a full-IFR certified panel with an IFR GPS, the
KLN89B. So avionics is 310 TT.
I built the first series 90 conversion flying. I had built the CT tail
off the airplane and was about to put it on when EDI came out with the
S-90 conversion. I went to Oregon and flew each version one right after
the other. The S-90 felt most like my F33 Bonanza, so I wrote a check
that day. I'm VERY pleased with the larger tail and the IO540 engine
combination.
I have about $235K invested in the airplane. I had it built by Phoenix
Composites. The panel as I said was done by JA Avionics. After it is
painted and flying, I am asking $160K. I have a bunch of stuff to go
with the airplane like:
* Custom cabin cover
* Two Bose headsets with permanent installed connections for pilot/co-pilot
* Tow bar
* Several boxes of additional switches, circuit breakers, etc.
Jerry Sjoustrand knows a lot about my airplane. He has been a tremendous
help in "completing it" after Phoenix Composites was done. I have copied
him on this note in the event you wish to talk to him about it.
I will send the pictures and logs by overnight mail.
Please email me any other questions!
Thanks, Bob
Please see attached spec sheet.N4382A
1995 EDI Express
Experimental ñ Amateur Built
Serial Number 10008
Total Time: 310 since new; first flight 12/23/95
Annual Due: October 1999
IFR Pitot/Static Due: October 2000
Fuel Capacity: 88 gallons useable
Engine: Lycoming IO540-C4B5 by DeMars Aero
290 hp @ 2700rpm 300 since new, 50 STOH
Propeller: McCauley 3-blade
Exterior: (to be painted), buyers choice
Interior: Tan (RD8006) Spinneybeck Leather seats with Wine (2624) Douglas Wool Turn
Point inserts
Tan (RD8006) Spinneybeck leather headliner
Wine (2624) Douglas Wool Turn Point side panels
Tango (02821) Aircraft Interior Products Magnum carpets and kick panels
Avionics: King Silver Crown Panel by JA Air Center Dupage, IL
Audio Panel KMA-24A
NAV1/COM1 King KX165
NAV2/COM2 King KX165
HSI King KCS-55A
VOR Indicator King KI-209
Transponder KT-76A
GPS King KLN89B IFR
Enroute and Approach
Certified
Moving Map Eventide Argus 3000
Autopilot STEC-50 2-axis
Intercom QuietFlite Intrepid Stereo
Weather Avoidance Insight SF2000 Strikefinder
Stereo Alpine AM/FMStereo
Cassette w/ 6-disk CD
Changer
Headphones (2) Panel mounted Bose
(2) David Clark w/stereo
modification
Ground Clearance Energy Saver Switch
NAV1/GPS Switching
Pilot/Co-pilot PTT, electric trim and A/P disconnect
Miscellaneous
Custom cabin cover and bag
ADC remote mount oil filter
ElectroAir electronic ignition replaces right magneto
Vision Microsystems VM1000/EC100 Engine Management System
ELT-110 Emergency Locator Beacon
Ameri-King AK-350 Altitude Encoder
Three position strobe lights
Tow bar
Electronic G-meter
Baggage door
Electric rudder and elevator trim
Electric flaps -5° to 40°
Specifications/Performance
Fuel Capacity 92 gallons, 88 gallons usable
Empty Weight 2,040 pounds
Gross Weight 3,200 pounds
Useful Load 1,160 pounds
Cruising Speed 165kts TAS 8,500 ft. 2,300 rpm 21î (data taken w/o final paint)
Stall Speed, Vso 55kts IAS
ROC 800fpm at MGTOW, 1,200 fpm with pilot and 40 gallons
This aircraft had a landing incident on November 25, 1998. The inboard gear attach bracket weld on Rib R failed causing the right main gear to fold in an upward direction. On rollout, the left inboard gear attach bracket failed also. Repairs are nearly complete. Email photos of the damage are available. NO PROP STRIKE! Wings are going to paint 5/24/99, balance of the aircraft will go to paint around June 1. Aircraft completed and flying by July 1.