Apollo 16

On April 16,1972, John W. Young, Thomas K. Mattingly II, and Charles M. Duke Jr., launched the Apollo 16 at Kennedy Space Center and headed off toward the moon. The primary mission objectives were to inspect, survey, and sample materials in the Descartes region, to continue surface experiments, conduct more in-flight experiments and photographic tasks from lunar orbit, evaluate the engineering of the Apollo 16 and equipment, and perform zero-gravity experiments. The mission was achieved in one day, but the NASA scientists still got their data.

Facts and Statistics from the NSSDC (National Space Science Data Center) Master Catalog:
Apollo 16 launched on 16 April 1972 at 17:54:00 (12:54:00 p.m. EST) on Saturn V SA-511 from Pad 39A at Kennedy Space Center. (The launch was postponed from the originally scheduled date, March 17, because of a docking ring jettison malfunction.) The spacecraft entered Earth parking orbit at 18:05:56 UT and trans-lunar injection took place at 20:27:37 UT. The CSM and S-IVB stage separated at 20:58:59 UT and CSM-LM docking was achieved at 21:15:53 UT. The S-IVB stage was released into a lunar impact trajectory, but due to an earlier problem with the auxiliary propulsion system (APS) helium regulators, which resulted in continuous venting and loss of helium, the second APS burn could not be made. Tracking of the S-IVB was lost on 17 April at 21:03 UT due to a transponder failure. (The S-IVB stage impacted the Moon on 19 April at 21:02:04 UT at 1.3 N, 23.8 W with a velocity of 2.5 to 2.6 km/s at a 79 degree angle from the horizontal, as estimated from the Apollo 12, 14 and 16 seismic station data.) A mid-course correction was performed at 00:33:01 UT on 18 April. During trans-lunar coast a CSM navigation problem was discovered in which a false indication would cause loss of inertial reference, this was solved by a real-time change in the computer program. The SIM door was jettisoned on 19 April at 15:57:00 UT and lunar orbit insertion took place at 20:22:28 UT. Two revolutions later the orbit was lowered to one with a perilune of 20 km.
At 15:24 UT on 20 April Young and Duke entered the LM. The LM separated from the CSM at 18:08:00 UT, but the LM descent was delayed almost 6 hours due to a malfunction in the yaw gimbal servo loop on the CSM which caused oscillations in the service propulsion system (SPS). Engineers determined that the problem would not seriously affect CSM steering and the mission was allowed to continue with the LM descent. The LM landed at 02:23:35 UT on 21 April in the Descartes highland region just north of the crater Dolland at 9.0 S, 15.5 E. Young and Duke made three moonwalk EVAs totaling 20 hours, 14 minutes. During this time they covered 27 km using the Lunar Roving Vehicle, collected 94.7 kg of rock and soil samples, took photographs, and set up the ALSEP and other scientific experiments. Other experiments were also performed from orbit in the CSM during this time.
The LM lifted off from the Moon at 01:25:48 UT on 24 April after 71 hours, 2 minutes on the lunar surface. After the LM docked with the CSM at 03:35:18 UT the lunar samples and other equipment were transferred from the LM and the LM was jettisoned at 20:54:12 UT on 24 April. The LM began tumbling, apparently due to an open circuit breaker in the guidance and navigation system. As a result the planned de-orbit and lunar impact could not be attempted. The LM remained in lunar orbit with an estimated lifetime of one year. The instrument boom which carried the orbital mass spectrometer would not retract and was jettisoned. Because of earlier problems with the SPS yaw gimbal servo loop the mission was shortened by one day. The orbital shaping maneuver was cancelled, and the sub-satellite was spring-launched at 21:56:09 UT into an elliptical orbit with a lifetime of one month, rather than the planned one-year orbit. Trans-earth injection began at 02:15:33 UT on 25 April. On 25 April at 20:43 UT Mattingly began a cislunar EVA to retrieve camera film from the SIM bay and inspect instruments, two trips taking a total of 1 hour, 24 minutes. The CM separated from the SM on 27 April at 19:16:33 UT. Apollo 16 splashed down in the Pacific Ocean on 27 April 1972 at 19:45:05 UT (2:45:05 p.m. EST) after a mission elapsed time of 265 hrs, 51 mins, 5 secs. The splashdown point was 0 deg 43 min S, 156 deg 13 min W, 215 miles southeast of Christmas Island and 5 km (3 mi) from the recovery ship USS Ticonderoga.